Flowline
TransGas Meadow Lake Mods TX6152
Client
TransGas
Project
Flowline
Timeline
July 1 to September 1, 2017
Location
Meadow Lake, Saskatchewan
Project Highlights
Fabrication and Installation of 522 diameter inches (6" OD) as required to install, one Pigging Facility, One Block Valve, One Stopple Tapoff & One Riser Future.
Supply crew and equipment as required to de-energize existing gas line and perform tie in welding as required.
M&N Energy Services Motto
“Our work is never so urgent or important that we cannot take time to do it safely.”
M&N Energy Services Ltd.
Box 249
4511 Victoria Avenue
Coronation, AB
T0C 1C0
403-578-2016 |