TransGas Meadow Lake Mods TX6152

Client

TransGas

Project

Flowline

Timeline

July 1 to September 1, 2017

Location

Meadow Lake, Saskatchewan

Project Highlights

  • Fabrication and Installation of 522 diameter inches (6" OD) as required to install, one Pigging Facility, One Block Valve, One Stopple Tapoff & One Riser Future.

  • Supply crew and equipment as required to de-energize existing gas line and perform tie in welding as required.