Flowline
TransGas Beacon Hill & Shellbrook Mods
Client
TransGas
Project
Flowline
Timeline
August 15 to August 31, 2016
Location
Meadow Lake, Saskatchewan
Project Highlights
Fabrication and Installation of 700+ diameter inches (6" & 12") as required to install, two Pigging Risers and One Block Valve.
Supply crew and equipment as required to de-energize existing gas line and perform tie in welding as required.