Flowline

Pengrowth Lindbergh Facility

Client

Pengrowth

Project

Flowline

Timeline

2013 to 2015

Location

Bonnyville, Alberta

Project Highlights

  • Construction of 50 modular piping. skids including the support of Electrical, Instrumentation and Insulation contractors.

  • Fabrication of 19,000+ meters of above grade piping and spools. 8" to 16" pipe diameters.

  • Construction of 3 well pads including the setting of 21+ modular skids and the installation of piping spools.

  • Cutting & Capping of 9000+ piles, including the setting of structural steel frames, supports and the installation of 3 bridge 3 piping modules.