March - Nov 2013

Location

Maple Creek to Assiniboia SK

Project Highlights

The Vantage Pipeline consisted of the construction and installation of 328 km of 10”Gr. 359 Cat II, Carbon Steel Pipe. In addition to the pipeline construction the project entailed the installation of 2 pigging facilities and 12 Block Valve settings.

M&N controlled and assisted in the installation of over 100 crossings, completed by Horizontal Directional Drilling with bore sections ranging in length from 50 to 500 meters.

The Vantage Pipeline was the longest Cross Country Pipeline Project that M&N Construction has completed to date and represents a significant project accomplishment to our company and employees. The project crossed various terrains from the Cypress Hills to flat and sandy prairie landscapes, through treaty land and various environmentally sensitive areas requiring delicate construction
methods.

The project required a peak crew size above 300 employees and subcontractor’s which became the largest single spread, managed by M&N Construction.