Pipeline Construction

Pembina Resthaven Pipeline Project

Client

Pembina

Project

Pipeline Construction

Timeline

Dec 2014 - Sept 2015

Location

Grande Cache, AB

Project Highlights

The Resthaven Gas Gathering Pipeline Project entailed the installation of 28km worth of NPS 12, FBE mainline, installed through various environmentally sensitive features (wetlands, watercourses, muskeg, ARCH areas). M&N was also responsible for the installation and oversight of 12 design HDD crossings totaling 6919 meters and ranging in length from 200 – 1225 meters.

Note: 40% of the ROW was considered Steep Slope Terrain (±33 ̊)