Pipeline Construction
Pembina Resthaven Pipeline Project
Client
Pembina
Project
Pipeline Construction
Timeline
Dec 2014 - Sept 2015
Location
Grande Cache, AB
Project Highlights
The Resthaven Gas Gathering Pipeline Project entailed the installation of 28km worth of NPS 12, FBE mainline, installed through various environmentally sensitive features (wetlands, watercourses, muskeg, ARCH areas). M&N was also responsible for the installation and oversight of 12 design HDD crossings totaling 6919 meters and ranging in length from 200 – 1225 meters.
Note: 40% of the ROW was considered Steep Slope Terrain (±33 ̊)
M&N Energy Services Motto
“Our work is never so urgent or important that we cannot take time to do it safely.”