Flowline
Connacher Oil & Gas
Client
Connacher Oil & Gas
Project
Flowline
Timeline
2009 to 2011
Location
Wandering River, Alberta
Project Highlights
Fabrication & Installation of 32,000+ meters of above grade piping and spools. 6" to 14" pipe diameters.
Construction of 3 well pads including the setting of 20+ modular skids and the fabrication & installation of piping spools connecting the well heads to the modular buildings.
Cutting & Capping of 10,000+ piles, including the setting of structural steel frames, supports.
M&N Energy Services Motto
“Our work is never so urgent or important that we cannot take time to do it safely.”
M&N Energy Services Ltd.
Box 249
4511 Victoria Avenue
Coronation, AB
T0C 1C0
403-578-2016 |
[email protected] |
- © M&N Energy Services Ltd.
- |
- Privacy Policy
- |
- Website Credits