Expertise
Over 25 Years Of Experience
We work with small to medium diameter pipe from 2" to 24" and our lines have no length limit. Our experience with all piping materials including steel pipe, HDPE plastic pipe, flex pipe and fibreglass pipe. Our management and key field personnel have experience of more than 25 years in pipeline installation, river crossings, and pipeline repair and maintenance.
Pipeline construction - over 2000 km of carbon steel pipeline installation experience ranging from OD sizes 2” to 20”.
Integrity - Hot tap, stopple, digs and HDD section replacements.
Flowline construction - 51,400 meters of flowline piping fabricated and installed (3” to 20”) installation of 50+ wellpairs.
Areas of Expertise
Recent Projects
The Tougher. The Better. We Do It All.
From pipeline installation to above ground flowline construction to integrity digs, we provide a full range of oil and gas pipeline construction services in Alberta and throughout western Canada.
M&N Energy Services Ltd.
Box 249
4511 Victoria Avenue
Coronation, AB
T0C 1C0
403-578-2016 |
[email protected] |
- © M&N Energy Services Ltd.
- |
- Privacy Policy
- |
- Website Credits